Nevada Energy

Nevada Energy

Henderson, Nevada

  • Project area: Evaporative Lined Ponds for Process Water
  • Regulatory agencies: Nevada Division Of Wildlife and US Fish and Wildlife
Problem: Wildlife and bird issues with contaminants in large holding ponds at their facility
Solution: Elevated pipe and cable structure with netting was installed to cover two very large ponds that were 250,000 sq ft each.